在线免费看av-国产一区免费-国产91在线观看-狠狠av-男女裸体无遮挡做爰-日韩精品一区二区三区免费视频-男女无遮挡做爰猛烈视频-久久久国产精品人人片-91本色-国产一级一片免费播放-中文字幕23-亚洲无套-精品福利电影-香蕉茄子视频-色婷婷av一区二区三区gif-黄色91在线观看-95看片淫黄大片一级-国产亚洲成人av-国产毛片久久久久久国产毛片-亚洲精品乱码久久久久久9色

Hello, welcome to Jinan Huawei CNC machinery CO., Ltd

Advanced Search:


Contact us


contact us

Contacts:JI Manager

Unified hotline:400-6587-688

Tel: (86)531-88276988

Fax:(86)531-88276988

Phone number:0086-15269186223

Address: No.18 Tonghua Road ,

Licheng district , Jinan city, 
shandong province, China



Company news

The correct method for grounding laser cutting machines

Source: Time:2019-09-10 15:00:55 views:

Laser cutting machines require strong power to ensure stability during operation. Due to the high voltage connection, the grounding wire is an important part of the usage process, but it is often easily overlooked. Poor grounding may lead to leakage and pose a personal safety hazard. So how about grounding work?
Be prepared before grounding:
The grounding device must be 2-4X 1500 mmX 35 degrees. It should be 1 meter away from any damp place around the house. Then use it three times; Every time a 30mm flat iron guide rail is used to excavate the joint, a good grounding network is formed.
When the local surface connection is completed, the grounding resistance is measured by an instrument. The standard resistance is 3 to 5 ohms.
3. Display. After measuring the resistance, connect one end of the rvv2.5mm2 copper core wire to the lead end of the grounding grid and directly insert it into the grounding hole of the socket used in the laser cutting machine.
  Installation steps:
Firstly, find a damp place at home, dig a soil surface of 1.5 square meters * 300 millimeters, and then use a 2 x 30 millimeter flat iron to weld or connect a 7 millimeter hole, making the ground 1.8 meters high, A clean graveyard of soil& nbsp;
2. Use measuring instruments to measure the grounding resistance of the measurement network.
3. Drill an 8mm hole at the top of the iron, drill it around the hole, and then apply a layer of pituitary gland to tighten the metal wire and flat iron.
4. Guide the wires into the user's trunking and add a safety grounding wire to the grid.
keys: